Our Projects

ONGOING PROJECTS

Work
Order No

Description Of Work

Client Name

Project Status

"IRWO/Ext.Elect/ Chennai/ IIB" Supply, Installation, Testing & Commissioning of 3X500KVA Distribution Transformers, 11kV RMUs, HRC Pillar Boxes and allied works including construction of cable trench in IRWO Housing Project. INDIAN RAILWAY WELFARE ORGANISATION ONGOING
"WO/21-22/0025 Dated 06.08.2021" Electrical Liasoning Services with TANGEDCO & CEIG PRINCE RATNAPURI CONSTRUCTION ONGOING
"SBU - METROS & TUNNELS/CMRL PHASE-II CORR-3 TU- 01/660012/1544" Charges for Electrical Utility Diversion / Shifting Works Including Cost of Materials and Services TATA PROJECT LIMITED / CMRL ONGOING
WO DT. 04.02.2021 SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 62.5KVA DIESEL GENERATOR, SUPPLY & INSTALLATION OF METERING PANEL AND LT PANEL, ALLIED CABLE LAYING WORKS, EARTHING WORKS AND TANGEDCO LIASING. COMMERCIAL COMPLEX ONGOING
URC/CMRL MD/WO/EB OHL WORKS/VN POWER /01 Supply, Installation, Testing & Commissioning of Overhead Line Works URC CONSTRUCTION (P) LTD ONGOING


COMPLETED PROJECTS

Work
Order No

Description Of Work

Client Name

Project Status

NCC/CMRL-ECV 101
W.O.13/17.07.2018
Work Order for Supply, Installation, Testing and Commissioning of LT Distribution Pillar Box with combined UG Cable Works at Thiruvottiyur High Road Chennai. NCC/CMRL Completed
NCC/CMRL-ECV 101
W.O.14/17.07.2018
Work Order for Supply, Installation, Testing and Commissioning of LT Distribution Pillar Box with combined UG Cable Works at Thiruvottiyur High Road Chennai. NCC/CMRL Completed
NCC/CMRL-ECV 101
W.O.15/17.07.2018
Work Order for Supply, Installation, Testing and Commissioning of LT Distribution Pillar Box with combined UG Cable Works at Thiruvottiyur High Road Chennai. NCC/CMRL Completed
NCC/CMRL-ECV 101 W.O.22/31.08.2018 Work Order for Supply, Installation, Testing and Commissioning of 11KV HT & LT Underground Cable Network with 250KVA Distribution Transformer, Ring Main Unit for Existing 11KV Tollgate Feeder of Tollgate Substation. NCC/CMRL Completed
NCC/CMRL-ECV 101
W.O.23/31.08.2018
Work Order for Supply, Installation, Testing and Commissioning of 11KV HT & LT Underground Cable Network with 250KVA Distribution Transformer, Ring Main Unit for Existing 11KV CBH Feeder of Tollgate Substation. NCC/CMRL Completed
NCC/CMRL-ECV 101
W.O.26/25.10.2018
Work Order for Supply, Installation, Testing and Commissioning of 11KV HT & LT Underground Cable Network with 500KVA Distribution Transformer, Ring Main Unit for Existing 11KV Venkatachalam Road SS of Tollgate Substation. (Pile No 63) NCC/CMRL Completed
NCC/CMRL-ECV 101
W.O.27/25.10.2018
Work Order for Supply, Installation, Testing and Commissioning of 11KV/ 3Cx300 Sqmm UG Cable for shifting of Existing NT Road Northern Feeder of Tollgate Substation. NCC/CMRL Completed
NCC/CMRL-ECV 101
W.O.34/18-19
Work Order for Supply, Installation, Testing and Commissioning of 11KV HT & LT Underground Cable Network with 2 Nos 500KVA Distribution Transformer, with Erection of 11KV Ring Main Unit 3 Nos R-R-R-L-L / R-R-R-R-R / R-R-R-R-L breaker combination for shifting of 11KV Networks at 10 Pole Structure with Two Nos 500KVA Distribution Transformer near Thiruchinankuppam T.H Road Rajakadai SS, Chennai. NCC/CMRL Completed
NCC/CMRL-ECV 101
W.O.59(A)/26.08.2019
Work Order for Supply, Installation, Testing and Commissioning of LT Distribution Pillar Box with combined UG Cable Works at Radha Bakery near Lakshmi Koil STP-17A East Side, Thiruvottiyur High Road, Chennai. NCC/CMRL Completed
WO Dt. 10.09.2020 LT Distribution System Strengthening for 200KW. AKSHAYA DIGINET Completed
WO HO/20-21/OP469 LT Distribution System Strengthening for 220KW. STANFAB APPARELS Completed
WO Dt. 21.07.2020 Supply, Installation, Testing & Commissioning of 500KVA 11KV/433V Transformer, HT & LT Panels and other associated works including Liaising with CEIG & TNEB. CHENNAI PUBLIC SCHOOL Completed
WO Dt. 11.01.2021 LT Distribution System Strengthening for 75KW, Supply, Installation, Testing & Commissioning of 62.5KVA Diesel Generator, Supply & Installation of Metering Panel and LT Panel, Allied cable laying works, Earthing works and TANGEDCO Liasing. ST. PETER & PAUL SEA FOOD EXPORTS (P) LTD. Completed
WO Dt. 04.02.2021 Supply, Installation, Testing & Commissioning of 62.5KVA Diesel Generator, Supply & Installation of Metering Panel and LT Panel, Allied cable laying works, Earthing works and TANGEDCO Liasing. COMMERCIAL COMPLEX Completed
"PO Number: 7600060116 PO Date: 17-NOV-21" Electrical Connection Charges KEC / CMRL Completed